3 Quotes for Westside Entrance Improvements

Pavement Maintenance

Contractors LLC QUOTE
(903) 539-2531 (903) 574-8374 FreeEstimates@PavementMC.comDate:5/11 /2026
To:Expiration Date:6/1 1/2026

Name: Harold Beasley Address:

Telephone:

Option A  
Clean and prepare area  
Tac Coat  
Pave with 2 1/2″ Hot Mix Asphalt  
Compact $9,500
   
Option B  
Clean and prepare area  
Tac Coat  
Pave with 3 1/2″ Hot Mix Asphalt  
Compact $14,250
   
   

All payment methods accepted (4% surcharge on credit card payment)

Thank you for your business!

—PMC—

Pavement Maintenance Contractors LLC

Shady Brook POA 175 Caroline Ln Bullard, Tx 75757 (903) 825-6283

  ASPHALT PAVING Estimate # 339   Date 05/06/2026

Phone: (903) 330-2924

Email: adamcooper850@yahoo.com Fax: (903) 3300924

Description

  1. Prepping a 95ft x 25ft by blowing off all loose debris.
  2. Tack will be applied.
  3. 95ft x 20ft will be laid with HOT MIX ASPHALT around a 1-3/4 to 2 inches after compaction.    

By signing this document customer agrees to the terms on this document.

Payment due upon completion.        

                                                                                          Subtotal                                                                                         $6,284.00

                                                                                          Total                                                                                      $6,284.00

Shady Brook POA

Estimate

                                                                                                                                                                                                                      ELI’VE                                                                                                                                                                                                                    R U ION

ELITE CONSTRUCTION & PAVING, Main Mabank TX, United States

FOR

Harold Beasley                  Estimate No.. 3876 Shady brook Sub.             Issue date: 5/11/2026 Bullard TX       Valid until 512512026

United States

   Totaldue (USD) $5,106.00      

       Description                                                          Quantity Unit price ($) Discount % Amount ($)

        HOT MIX/ Overlay                     1               5,106.00                   0.00                                                                                                                                  5,106.00

Scope of Work / Work Description

Contractor shall furnish all labor, supervision, materials, trucking, equipment, and incidentals necessary to complete the installation of approximately 2,325 square feet of 3-inch compacted Hot Mix Asphalt (HMA) overlay over the existing asphalt surface within the approximate dimensions of 95′ x 25′.

Work shall include surface preparation and cleaning of existing pavement, application of tack coat to promote proper adhesion between surfaces, placement and grading of hot mix asphalt to establish a uniform finish and proper water drainage, and mechanical compaction utilizing appropriate rolling equipment to meet industry standards for density and finish.

All work areas shall be left clean upon completion, including removal and disposal of excess materials and job-related debris. Work to be completed in a professional and workmanlike manner in accordance with standard asphalt paving practices.

Disclaimers / Conditions

Due to the nature of asphalt overlay work being installed over an existing surface, minor roller marks,surface imperfections, and visible seam lines may occur and shall be considered normal and acceptable. * Existing pavement deficiencies, including but not limited to cracks, settling, movernent, potholes, low areas, or base failures beneath the existing sufface, may reflect through the new overlay over time. Contractor is not responsible for future reflective cracking or movement caused by existing subgrade or pavement conditions.

Asphalt installed adjacent to grass, dirt, or uncontained edges may experience slight edge raveling,separation, vegetation intrusion, or edge deterioration over time due to lack of concrete curbing or edge restraint.

Contractor is not responsible for damage caused by excessive vehicle weight, fuel or oil spills, tirescuffing. acts of naturet drainage issues, or improper use after installation.

Customer shall keep ali traffic off newly paved surface until recommended curing time has passed.

Minor scuffing or markings during initial curing period are normal.

Final asphalt appearance and color variations are normal during curing and weathering

processes. Description

      Total (USD):                                                                                           $5,106.00

Issued by, signature:

          Brandon                                                                                                    8305008500             l?] bran Ionairheart@enertechresources.com

ELITE CONSTRUCTION & PAVING

Main

Written by Linda Williams